Feasibility Study on Construction of Sewage Treatment Plant at College Campus

G. Venkatesan1* V. Rajagopalan1 B.K. Ramesh1 K. Arokiyadoss1 Arun Jesudoss1 C. Shanmugasundaram1 N. Sridhar1
Show Less
1 Department of Civil Engineering, Anna University of Technology Tiruchirappalli Tiruchirappalli – 620 024, India
AJWEP 2016, 13(4), 83–87; https://doi.org/10.3233/AJW-160042
Submitted: 19 July 2012 | Revised: 20 September 2016 | Accepted: 20 September 2016 | Published: 13 October 2016
© 2016 by the Author(s). This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution -Noncommercial 4.0 International License (CC-by the license) ( https://creativecommons.org/licenses/by-nc/4.0/ )
Abstract

Waste water in the Anna University campus is being disposed off by means of septic tanks; nowadays these septic tanks are not sufficient for disposal of these waste waters. Based on the waste water analysis and report which depend upon the characteristics of the raw sewage it has been decided to construct activated sludge process treatment plant in the university campus to protect the good environmental conditions. The treatment unit process consists of screening chamber, grit chamber, primary treatment, aeration tank, secondary treatment and sludge disposal etc. The treatment plant will be designed for an ultimate period of 30 years with CPHEEO norms. The treated waste water shall be utilized for developing the plants, trees and landscaping works in the university campus.

Keywords
BOD
reuse
sewage
sludge
treatment
Conflict of interest
The authors declare they have no competing interests.
Share
Back to top
Asian Journal of Water, Environment and Pollution, Electronic ISSN: 1875-8568 Print ISSN: 0972-9860, Published by AccScience Publishing