AccScience Publishing / IJOCTA / Volume 2 / Issue 2 / DOI: 10.11121/ijocta.01.2012.00105
Cite this article
1
Download
1379
Views
Related Info Links
Journal Browser
Volume | Year
Issue
Search
News and Announcements
View All
OPTIMIZATION & APPLICATIONS

A Simulation Integrated Investment Project Ranking and Selection Approach

Ozgur YALCINKAYA1 ,  Ozgur ARMANERI1
Show Less
1 Department of Industrial Engineering, Dokuz Eylul University, Buca , Izmir - Turkey
IJOCTA 2012, 2(2), 153–172; https://doi.org/10.11121/ijocta.01.2012.00105
Received: 6 February 2012 | Published online: 12 June 2012
© 2012 by the Author(s). This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution -Noncommercial 4.0 International License (CC-by the license) ( https://creativecommons.org/licenses/by-nc/4.0/ )
Abstract

Enterprises are confronted with several project alternatives that they assume to gain  revenue in the future, but their own economical resources are limited to carry out all alternatives.  Therefore, a decision process arises to prioritize and select among alternatives according to the  predetermined goals and criteria to reach the maximum utilization. On the other hand, in project  evaluation, the values of project parameters are often assumed to be known with complete certainty.  However, project parameters normally change during a life cycle of the project, and it is necessary  to consider uncertainty and risk phenomena while evaluating projects. Simulation-based project  evaluation approaches enable to make more reliable investment decision since they permit to include  future uncertainty and risk in analysis process. In this article, a novel simulation-based optimal  decision approach is proposed for evaluating and comparing investment projects under uncertain  and/or risky environments. The phases of the proposed approach are; (a) developing the  effectiveness measure formulation of a project, (b) identifying and checking all controllable project  parameters that affect the measure, (c) developing simulation model for the measure, and (d)  performing the project ranking and selection procedures in order to rank and select the projects.  Three ranking and selection procedures, previously used for comparing performances of the  different production/service systems, are embedded in the proposed approach.

Keywords
Project risk assessment;Investment project evaluation;Simulation;Ranking and Selection
Conflict of interest
The authors declare they have no competing interests.
References

[1] P. Jovanovic, Application of sensitivity  analysis in investment project evaluation  under uncertainty and risk, International  Journal of Project Management, 17, 217- 222, 1999.

[2] Ö. Armaneri, G.Özdağoğlu, Ö. Yalçınkaya,  Proje risk düzeyinin belirlenmesi için  simülasyonu ve bulanık kümeler teorisini  temel alan bütünleşik bir yaklaşım. Anadolu  University Journal of Science and  Technology, 9, 2, 223-239, 2008 (in  Turkish).

[3] Ö. Armaneri, G.Özdağoğlu, Ö. Yalçınkaya,  An Integrated Decision Support Approach  for Project Investors in Risky and Uncertain  Environments. Journal of Computational and  Applied Mathematics, 234, 8, 2530-2542,  2010.

[4] L. Dimova, P. Sevastianov, D. Sevastianov,  MCDM in a fuzzy setting: Investment  projects assessment application,  International Journal of Production  Economics, 100, 10-29, 2006.

[5] A.B. Badiru, D.B. Sieger, Neural network as  a simulation metamodel in economic  analysis of risky projects, European Journal  of Operational Research, 105, 130-142,  1998.

[6] A.L. Medaglia, S.B. Graves, J.L. Ringuest,  A multiobjective evolutionary approach for  linearly constrained project selection under  uncertainty, European Journal of  Operational Research, 179, 869-894, 2007.

[7] B. Rebiasz, Fuzziness and randomness in  investment project risk appraisal, Computers  & Operations Research, 34, 199-210, 2007.

[8] E. Borgonovo, L. Peccati, Uncertainty and  global sensitivity analysis in the evaluation  of investment projects, International Journal  of Production Economics, 104, 62-73, 2006.

[9] E.E. Karsak, E. Tolga, Fuzzy multi-criteria  decision-making procedure for evaluating  advanced manufacturing system  investments, International Journal of  Production Economics, 69, 49-64, 2001.

[10] S. Mohamed, A.K. McCowan, Modelling  Project investment decisions under  uncertainty using possibility theory,  International Journal of Project  Management, 19, 231-241, 2001.

[11] X. Huang, Optimal project selection with  random fuzzy parameters, International  Journal of Production Economics, 106, 513- 522, 2007.

[12] G. Powers, J.Y. Ruwanpura, G. Dolhan, M.  Chu, Simulation based project selection  decision analysis tool, Proceedings of  Winter Simulation Conference, 1778-1785,  2002.

[13] T.L. Saaty, L.G. Vargas, Models, Methods,  Concepts & Applications of the Analytic  Hierarchy Process, International Series in  Operations Research and Management  Science, 34, Kluwer, Boston, 2000.

[14] J.W. Lee, S.H. Kim, An integrated approach  for independent information system project  selection, International Journal of Project  Management, 19, 111-118, 2001.

[15] J.Y. Teng, G.H. Tzeng, Transportation  investment project selection using fuzzy  multiobjective programming, Fuzzy Sets and  Systems, 96, 259-280, 1998.

[16] K.M.A. Al-Harbi, Application of the AHP in  project management, International Journal of  Project Management, 19, 19-27, 2001.

[17] M. Enea, T. Piazza, Project Selection by  Constrained Fuzzy AHP, Fuzzy  Optimization and Decision Making, 3, 39- 62, 2004.

[18] M. Oral, O. Kettani, Ü. Çınar, Project  evaluation and selection in a network of  collaboration: A consensual disaggregation  multi-criterion approach, European Journal  of Operational Research, 130, 332-346,  2001.

[19] R. Bellman, L. Zadeh, Decision making in a  fuzzy environment, Management Science,  17, 141-164, 1971.

[20] T.L. Saaty, Axiomatic foundation of the  analytic hierarchy process, Management  Science, 32, 841-855, 1986.

[21] R.L. Keeney, H. Raiffa, Decisions with  Multiple Objectives: Preferences and Value  Trade-Offs, Wiley, New York, 1976.

[22] A.B. Badiru, P.S. Pulat, Comprehensive  Project management: Integrating,  Optimization Models, Management  Principles and Computers, Prentice Hall,  Englewood Cliffs, New Jersey, 1995.

[23] J.L. Cochrane, M. Zeleny, Editors, Multiple  Criteria Decision Making, Univ. South  Carolina Press, Columbia, SC, 1973.

[24] M. Zeleney, Multiple Criteria Decision  Making, McGraw-Hill, New York, 1982.

[25] C. Romero, A survey of generalized goal  programming, European Journal Operations  Research, 25, 183-191, 1986.

[26] R. Khorramshahgol, H. Azani, Y. Gousty,  An integrated approach to project evaluation  and selection, IEEE Transactions on  Engineering Management, 35, 265-270,  1988.

[27] A. Charnes, W. W. Cooper and R. O.  Ferguson, Optimal estimation of executive  compensation by linear programming,  Management Science, 1, 2, 138-151, 1955.

[28] B. Aouni, O. Kettani, Goal programming  model: A glorious history and a promise  future, European Journal of Operational  Research, 133, 225-231, 2001.

[29] M. Tamiz, D. Jones, C. Romero, Theory and  Methodology: Goal programming for  decision making: An overview of the current  state-of-the-art, European Journal of  Operational Research, 111, 569-581, 1998.

[30] R.E. Steuer, P. Na, Multiple criteria decision  making combined with finance: A  categorical bibliographic study, European  Journal of Operational Research, 150, 496- 515, 2003.

[31] E. Ammar, H.A. Khalifa, Characterization  of optimal solutions of uncertaintyinvestment problem, Applied Mathematics  and Computation, 160, 111-124, 2005.

[32] W.J.H. Van Groenendaal, Estimating NPV  variability for deterministic models,  European Journal of Operational Research,  107, 2002-213, 1998.

[33] F. Lefley, The payback method of  investment appraisal: a review and  synthesis, International Journal of  Production Economics, 44, 207-244, 1996.

[34] E. Borgonovo, L. Peccati, Sensitivity  analysis in investment project evaluation,  International Journal of Production  Economics, 90, 17-25, 2004.

[35] F. Lefley, Approaches to risk and  uncertainty in the appraisal of new  technology capital projects, International  Journal of Production Economics, 53, 21-33,  1997.

[36] A.M. Law, W.D. Kelton, Simulation  Modeling & Analysis, McGraw-Hill, Inc.,  Singapore, 1991.

[37] C.D. Pegden, R.E. Shannon, R.P. Sadowski,  Introduction to Simulation Using SIMAN,  McGraw-Hill, Inc., New Jersey, 1990.

[38] D.R. Anderson, D.J. Sweeney, T.A.  Williams, An Introduction to Management  Science: Quantitative Approaches to  Decision Making, 11th ed., Thomson SouthWestern, Ohio, 2005.

[39] W.D. Kelton, R.P. Sadowski, D.A.  Sadowski, Simulation with Arena. 1.  Edition, McGraw-Hill Inc, New York, 1997.

[40] S.L. Rosen, C.M. Harmonosky, M.T.  Traband, A simulation optimization method  that considers uncertainty and multiple  performance measures, European Journal of  Operational Research, 181, 315-330, 2007.

[41] J.R. McGuigan, R.C. Moyer, F.H. deB.  Harris, Managerial Economics:  Applications, Strategy, and Tactics, Ninth  edition, South-Western, Ohio, 2002.

[42] T. Merna, D.V. Storch, Risk management of  an agricultural investment in a developing  country utilising the CASPAR programme,  International Journal of Project  Management, 18, 349-360, 2000.

[43] C. Kahraman, D. Ruan, E. Tolga, Capital  budgeting techniques using discounted fuzzy  versus probabilistic cash flows, Information  Sciences, 142, 57-76, 2002.

[44] E.R. Coates, M.E. Kuhl, Using simulation  software to solve engineering economy  problems, Computers&Industrial  Engineering, 45, 285-294, 2003.

[45] Ö. Armaneri, Ö. Yalçınkaya, Evaluation of  Risky Investment Projects through  Simulation and Response Surface  Methodology. Lectures on Modeling and  Simulation, 7, 2, 21-30, 2006.

[46] Ö. Armaneri, Ö. Yalçınkaya, Belirsiz ve  Riskli Ortamlarda Yatırım Projelerinin  Değerlendirilmesine Yönelik Benzetim  Tabanlı Bir Yaklaşım, Anadolu University  Journal of Science and Technology-A  Applied Sciences and Engineering, 11, 1, 1- 16, 2010 (in Turkish). 

[47] C.S. Park, Contemporary Engineering  Economics, Third Edition, Prentice-Hall,  Inc, Upper Saddle River, New Jersey, 2002.

[48] H. Eski, Ö. Armaneri, Engineering  Economics, Gazi Publishing, Ankara, 2006.

[49] P.G. Keat, P.K.Y. Young, Managerial  Economics: Economic Tools for Today’s  Decision Makers, Third Edition, Prentice  Hall, Upper Saddle River, New Jersey,  2000.

[50] D. Dubois, H. Prade., Plenary Talk,  Possibility Theory and its applications: a  retrospective and prospective view- IRITCNRS, Toulouse, 2005.

Share
Back to top
An International Journal of Optimization and Control: Theories & Applications, Electronic ISSN: 2146-5703 Print ISSN: 2146-0957, Published by AccScience Publishing